The City of Playford engaged BE Engineering Solutions (BEES) to conduct an operational assessment of existing conditions and propose alternative design solutions.
The South Australian Government invested $32.9 million to upgrade an 800-meter section of Flagstaff Road between Hyland Avenue and Bonneyview Road in Flagstaff Hill. This vital infrastructure project aimed to improve road safety, traffic flow, and overall usability. As part of this initiative, Aurecon Australasia Pty Ltd engaged BE Engineering Solutions (BEES) to perform a Preliminary Design Road Safety Audit (RSA) and a Post-Construction day and night RSA and assessment for this critical section of Flagstaff Road.